The first of two dormitory sections of the LNG Canada camp at Kitimat is now being assembled. (Photo courtesy LNG Canada) One of the more visible above-ground projects now underway is that of the worker camp, Cedar Valley Lodge. (Contributed photo)

Workers’ camp at LNG facility in Kitimat takes shape

Extensive worker camp now being assembled

Born in Ireland but having spent years overseeing liquefied natural gas (LNG) construction projects in Australia, LNG Canada’s just-arrived general manager for its $40 billion facility in Kitimat is firm about his expectations.

“We want this to be the safest project on earth,” Vince Kenny says of construction which has just passed the one year mark leading to a planned finish in 2024.

With just under 1,000 people now working at the 400-hectare site, now is the time to cement that standard, he says.

“By the time we get to 5,000 people, we will have that culture in place,” Kenny emphasizes that this project which will be his seventh. “Unless we’ve got a culture, all the systems, processes and procedures are ineffective.”

Employees begin each shift reviewing the work plan, a procedure called a toolbox discussion.

“We’re here to take care of one another,” says Kenny, translating the IIF acronym that’s the hallmark of LNG Canada — Incident and Injury Free.

Even a brief tour of the works by a group of journalists from across B.C. starts with a video of LNG Canada workers outlining safety and security, the two words being almost interchangeable.

Workers have ID cards to be ‘badged in,’ creating an electronic record of their presence. They’re required to stay within their designated work area. There are constant security patrols. Vehicles are inspected for any fluid leaks before entry. There’s specific mention of drug-sniffing dogs too.

READ MORE: Okanagan company wins contract for LNG Canada project in Kitimat

No one gets on the site without basic safety equipment — hardhat, safety glasses, a high visibility vest, work boots and gloves. The driver of the tour bus taking the journalists to the site points out emergency exit windows. He brandishes a small hammer to smash a window if necessary. The bus doesn’t move until each passenger clicks in their seatbelt.

Victor Kenny, LNG Canada general manager

With Kenny is Trevor Feduniak who arrived in Kitimat in mid-2016. As the project site manager, he was one of the first senior LNG Canada people on location, overseeing the clearing of the former Methanex site and then expanding its footprint.

Although the project was not given the formal go-ahead until last October by LNG Canada’s investors Shell, PETRONAS from Malaysia, PetroChina from China, Mitsubishi Corporation from Japan and Korean-owned KOGAS, crews had been fully occupied raising up the location to a construction standard and to safeguard it against the possibility of tsunami sweeping inland from the Douglas Channel.

The fill comes from the nearby Sandhill, a mountain of material Feduniak describes as perfect for its material composition. One million cubic metres has already been transferred, edging away at the overall 2.5 million cubic metres that will have to be moved and placed in preparation for the arrival of two massive processing modules. From there, the gas will be transported via a pipeline from northeastern B.C., super-cooled to a liquid state for storage and then shipped out on specialized tankers to Asian customers.

“This is what we call coming out of the ground,” Feduniak explains as a tour bus winds its way through the site, encountering massive material-carrying trucks along the way.

Two streams that cross the site, the Kitimat Side Channel and Beaver Creek, were diverted to ensure Fluor-JGC has dry and stable conditions on which to construct the plant.

“When you disturb one habitat, you have to compensate with two [enhancement measures],” says Feduniak of the environmental work that was involved.

He compares the detailed water course replacement work for fish and other habitat to that of a landscaped Japanese garden.

One corner of the project site contains what, to the untrained eye, looks like sections of pipe stacked metres above the ground.

What they are are the pilings, 40 metres long, that will be driven into the ground upon which the two processing buildings will sit.

READ MORE: LNG Canada cost to exceed stated $40 billion price tag

Those processing modules being built in Asia are to be 70 metres long, 35 metres wide and 50 metres tall, the approximate height of a 13-storey commercial building.

They’ll be shipped to Kitimat in modular segments and assembled on-site, being transported to their final resting place via an elaborate series of interconnected trailers with hundreds of wheels controlled by a single operator using a remote control. So sophisticated is the transport system that the operator is able to place the modules within centimetres of where they need to be located.

The sheer height of the modules has meant raising Rio Tinto BC Works’ power lines that cross the site to deliver power to the smelter from Kemano, so that the modules can fit comfortably underneath when being moved.

One of the more visible above-ground projects now underway is that of the worker camp, Cedar Valley Lodge, which is being built by the ATCO-Bird joint venture, for another joint venture between Fluor Corporation and JGC, the overall general contractor on the project.

There’ll be two living unit sections with a series of common buildings in the middle.

One of the modular accommodation sections is now being assembled with a finishing schedule of next spring to meet a first goal of 1,500 “heads in beds” with 1,000 more beds to be added each quarter thereafter to the final total of 4,500.

Unlike camps of past, each worker will have his or her own bathroom and each room will have its own TV. There’ll be sound dampening and other acoustic methods so that sleeping quarters will be as quiet as possible. The living areas will be co-ed.

The middle buildings will contain administration offices, sports and recreation facilities including male and female gyms, kitchen and dining facilities, an entertainment centre, a licensed lounge, a medical clinic, storage for luggage and housekeeping and maintenance facilities.

There’ll be landscaping around the area and informational material describes the facility as having the “largest core footprint” of its kind in Canada.

“You want your workers to come here and then want to come back,” said LNG Canada spokesperson Susannah Pierce of the atmosphere and amenities of the facility.

More than 4,500 people will be onsite at any one time at the peak of construction, requiring between 7,000 to 7,500 people in all given the shift work nature of the project. Workers will be onsite for 14 days at a time, returning after a seven-day break.

All this compares to another large worker camp in B.C. — the 1,600-room facility at B.C. Hydro’s Site C project in northeastern B.C.

With accommodation facilities now underway, there’s other activity on the waterfront at two terminal sites.

LNG Canada is building Rio Tinto a new wharf in exchange for taking over the aluminum smelting company’s existing wharf. Dredging is now going on as part of that project.

kitimatLNGlng canada

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

LNG Canada project site manager Trevor Feduniak arrived in Kitimat in mid-2016. (Natalia Balcerzak/Terrace Standard)

LNG Canada’s ‘fish ladder’ at Anderson Creek, which allows fish to migrate despite construction-related work. (Natalia Balcerzak/Terrace Standard)

The middle buildings will contain administration offices, sports and recreation facilities including male and female gyms, kitchen and dining facilities, and other features. (Natalia Balcerzak/Terrace Standard)

Just Posted

The mandate is in keeping with recommendations made by Dr. Bonnie Henry. (CSRD photo)
Mask use now required at CSRD office, public facilities

The mandate comes after Dr. Bonnie Henry strongly recommended their use

Mara Lake is one of the significant water resources across the Okanagan-Shuswap region that will fall under increasing sustainability pressure as the anticipated population growth for the region continues in this century. (File photo)
Okanagan Valley water supply sustainability reaching a critical point: Global expert

Global expert says Okanagan Basin Water Board offers sustainable path forward

Black Press file photo
Golden/Field crime rate drops for fourth straight year

The decrease was reported by Stats Canada, who recently released their yearly crime stats for B.C.

Dr. Trina Larsen Soles recommends cotton face coverings, as they are the most effective. (Claire Palmer photo)
Golden’s physicians warn of second wave

It is now expected that everyone wear a mask while indoors in public places

Morgues.
Morning Start: Cruise ships have their own morgues

Your morning start for Friday, Oct. 30, 2020

Physical distancing signs are a common sight in B.C. stores and businesses. THE CANADIAN PRESS
272 more COVID-19 cases for B.C., outbreak at oil sands project

Three new health care outbreaks, three declared over

Vernon Council voted in favour of implementing a 500-metre buffer between all new cannabis stores in the city at its meeting Monday, Oct. 26, 2020. (Black Press files)
New cannabis shops in Vernon will need to stay 500m apart

The distancing rule won’t apply to existing stores, including the six currently in downtown core

A fundraising initiative has been set up to help Mirjana Komljenovic, who has been diagnosed with Hermansky Pudlak Syndome and requires $2,000 a month to cover the costs of her medication. (gofundme.com)
Fundraiser created to help Summerland woman with rare condition

Mirjana Komljenovic requires costly medication to treat Hermansky Pudlak Syndome

Heather Pescada is Ms. Halloween and when COVID threatened to ruin her haunted fun, she got creative, inventing a six foot candy chute at her Summerland, Trout Creek home.
(Peskelly Family Facebook page)
Okanagan Halloween house invents huge candy chute

The six foot chute looks like the snake from Nightmare Before Christmas

This house at 414 Royal Ave. became notorious for its residents’ and visitors’ penchant for attracting police. It was also the site of a gruesome torture in August 2018. It was demolished in 2019. KTW
6-year sentence for Kamloops man who helped carve ‘rat’ into flesh of fellow gang member

Ricky Dennis was one of three men involved in the August 2018 attack

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Cpl. Nathan Berze, media officer for the Mission RCMP, giving an update on the investigation at 11:30 a.m., Oct. 30. Patrick Penner photo.
VIDEO: Prisoner convicted of first-degree murder still at large from Mission Institution

When 10 p.m. count was conducted, staff discovered Roderick Muchikekwanape had disappeared

Among the pumpkin carvings created this year by Rick Chong of Abbotsford is this tribute to fallen officer Cont. Allan Young.
Abbotsford pumpkin carver’s creations include fallen police officer

Rick Chong carves and displays 30 pumpkins every year

Most Read