Work camp for the Site C dam is a self-contained town called Two Rivers Lodge, with restaurant, theatre, lounge, gym, yoga studio and hair salon. The camp is budgeted at $470 million to build and operate. (BC Hydro)

Site C dam project draws criticism at first public input session

The new NDP government initiated a review of the project

An American energy consultant told the BC Utilities Commission that the Site C hydroelectric dam currently under construction in the northeast region of the province doesn’t make sense from an economic or energy production perspective.

Robert McCullough of the Oregon-based firm McCullough Research, taking part in a public input session about the $8.8-billion project in Vancouver on Saturday, said that building dams for energy is an outdated practice.

He said the cost of renewable energy sources like wind and solar have decreased dramatically in the last five years and building a dam over the Peace River doesn’t make sense.

“The era of big iron has passed,” he said “We just have had a technological change that people are adjusting to now. We can actually save $1 billion dollars by simply abandoning the project and going to other technologies.”

McCullough said his firm would also be providing the utilities commission more detailed analysis of the project.

The province’s new NDP government directed the utilities commission to review the economic viability of the megaproject that was initiated by the former Liberal premier Christy Clark.

Proponents of the project have said it will create hundreds of jobs and support the province’s future energy needs.

WATCH: Work begins on Site C generators

More than 100 people attended Saturday’s session where 34 speakers were registered to voice their perspectives to the commission.

Galen Armstrong with the Sierra Club BC said although the dam will be located on the Peace River in the northeast region of the province, everyone will be paying for it in the years to come through increased hydro rates.

The utilities commission released a preliminary report Tuesday that said BC Hydro had already spent $1.8 billion on construction by June 30 and the cost of cancelling the project would amount to $1.1 billion.

But Armstrong said those costs don’t suggest the project is past the point of no return, as it represents a fraction of the total project cost, and its cancellation would spare the environmental implications of flooding rich agricultural land.

“It’s absolutely not past the point of no return in terms of First Nations who use the land … in terms of the farmers and the potential to grow food there,” he said. “I’m very hopeful they’ll make the right choice and end this project.”

The report also raised concerns that nearly half of the project’s $794-million contingency budget has already been spent, but it also said information is lacking to determine whether the project is overall on budget.

Site C would be the third dam on the Peace River, flooding an 83-kilometre stretch of valley, and has faced fierce opposition from local First Nations, landowners and farmers.

Ten more public input sessions are scheduled across the province in the coming weeks and a final report is expected to be delivered to the government on Nov. 1.

Site C

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Miri was adopted by owner Maria Scales sven months ago as she sought 
companionship during COVID. (Maria Scales photo)
‘Miri is going to be the last’; looking for answers to Golden’s vet shortage

It’s been four years since Golden had a vet of its own.

John McLachlan is set to give a physically distant performance that focuses on the nostalgia of childhood memories and coming together. (John Struthers photo)
John McLachlan shares musical tale of his life

The performance will be set to photos of McLachlan’s childhood, with nostalgic songs of growing up

Environment Canada has issued a snow warning for the Kootenays on Friday. File photo
Environment Canada issues snow warning for Friday

Two-to-10 centimetres is expected to fall

File photo
EDITORIAL: The power of a single vote

In the Oct. 24 British Columbia election, every vote is important

RCMP stock photo (Black Press)
Kelowna RCMP investigating unexplained death of cattle

Cattle found dead near gravel road, east of the Kelowna Airport

Provincial health officer Dr. Bonnie Henry presents modelling of COVID-19 spread in B.C., March 25, 2020. (B.C. government photo)
B.C. sets another COVID-19 record with 203 new cases

up to 1,766 active cases in B.C., two more deaths

Jordan Naterer, an electrical engineer from Vancouver, was last seen Saturday Oct. 10. (Facebook photo)
Search efforts to resume for missing Manning Park hiker; Trudeau speaks on case

PM says he’ll do what he can to ‘nudge’ efforts to find Jordan Naterer, yet has little leverage locally

Shuswap BC NDP candidate Sylvia Lindgren reports several campaign signs have recently been damaged or removed. (Jim Elliot-Salmon Arm Observer)
Shuswap candidate seeking those responsible for stolen, damaged signs

NDP and Green Party signs in the Sunnybrae area have been targetted

Smartphone showing various applications to social media services and Google. (Pixabay photo)
National media calling for level playing field with Google, Facebook

In Canada, Google and Facebook control 80 per cent of all online advertising revenues

École de L’Anse-au-sable. (Google Maps)
B.C. records first COVID-19 outbreak at school, six weeks after students return to class

Three cases of the virus have been identified at École de L’Anse-au-sable

Green Party leader Sonia Furstenau is seen as she leaves media event during a campaign stop in West Vancouver, B.C., Tuesday, October 20, 2020. THE CANADIAN PRESS/Jonathan Hayward
B.C. Green leader hopes voters see value in minority government

The Greens received nearly 17 per cent of the popular vote in 2017 yet received just three seats

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Local candidates Pam Alexis, Abbotsford-Mission, and Preet Rai, Abbotsford-West, look on as NDP Leader John Horgan main streets in Abbotsford, B.C., Wednesday, October 21, 2020. THE CANADIAN PRESS/Jonathan Hayward
B.C. NDP takes snap election risk during pandemic in quest for majority government

Green Leader Sonia Furstenau said the election was unnecessary and irresponsible during the pandemic

Liberal Leader Andrew Wilkinson speaks during a drive-in car rally campaign stop at a tour bus operator, in Delta, B.C., on October 17, 2020. THE CANADIAN PRESS/Darryl Dyck
B.C. Liberal Leader maintains confidence as campaign tests party identity

Liberal campaign has been disrupted by controversy

Most Read