Keep your old power meter, for a fee

People who insist on refusing smart meters can keep their old mechanical meter as long as it lasts, cost to be determined

A smart meter installer photographs a sign posted to refuse replacement of mechanical power meter

VICTORIA – People who insist on refusing new wireless electrical meters can keep their old mechanical meter as long as it lasts, if they pay a monthly fee, Energy Minister Bill Bennett announced Thursday.

Customers can keep their mechanical meters until they break down, their Measurement Canada accuracy seal expires or the customer relocates, the ministry said in a statement.

The mechanical meter option is added to an earlier compromise with BC Hydro customers who still don’t have a digital smart meter, which transmits power consumption and status via radio signals. Customers can have a digital meter with its transmission function turned off, or keep their old meter, as long as they pay the cost of having the meter read manually.

Bennett said the cost of meter reading will be about $20 a month. Customers who accept a deactivated smart meter will also pay a fee of about $100 to have it adjusted.

The fee to keep a mechanical meter will be higher, because it will require a separate system to manually record and bill for power consumption, Bennett said.

NDP energy critic John Horgan said he is pleased that the proposed fees will be reviewed by the B.C. Utilities Commission before being implemented. The opt-out provision should have been made available from the start, instead of rushing to meet the government’s artificial deadline to install smart meters, Horgan said.

BC Hydro reports that 60,000 smart meter installations have been delayed due to customer requests, while 1.8 million or 96 per cent of customers now have a functioning smart meter.

Some people persist in the belief that the radio signals from smart meters are a health hazard, despite the fact that the periodic meter signals represent a tiny fraction of the radio frequency exposure from a mobile phone call.

Bennett said mechanical or “analog” meters are obsolete, and eventually every customer will have a smart meter, whether it is set to transmit or not.

“Bear in mind, when somebody’s analog meter wears out, stops working or comes to the end of its useful life, there are no analog meters to reinstall,” Bennett said. “You can’t buy them anywhere.”

 

Just Posted

Search crews rescue kids, 6 and 7, stranded overnight on Coquitlam mountain

Father and two youngsters fall down a steep, treacherous cliff while hiking Burke Mountain

Your weekly Mountain Minute

Golden’s 60-second news recap

An Everest fundraiser

Man set to climb elevation of Mt. Everest in one day to raise school lunch funds

Interior Health study offers take-home drug testing kits to spot fentanyl

Interior Health to evaluate safety of at home drug testing kits aimed at reducing fentanyl overdoses

Golden Fire Rescue training grounds get a facelift

Residents may have noticed some changes at the fire hall in the… Continue reading

Killer of Calgary mother, daughter gets no parole for 50 years

A jury found Edward Downey guilty last year in the deaths of Sara Baillie, 34, and five-year-old Taliyah Marsman

Toddler seriously injured after falling from Okanagan balcony

RCMP are investigating after a two-year-old boy fell from the balcony of an apartment in Kelowna

Cost jumps 35% for Trans-Canada Highway widening in B.C.

Revelstoke-area stretch first awarded under new union deal

Is vegan food a human right? Ontario firefighter battling B.C. blaze argues it is

Adam Knauff says he had to go hungry some days because there was no vegan food

Winds helping in battle against fire threatening northern Alberta town

Nearly 5,000 people have cleared out of High Level and nearby First Nation

B.C. sends 267 firefighters to help battle Alberta wildfires

Out of control fires have forced evacuations in the province

Calgary Police looking for missing man who may be heading to B.C.

A man last seen on May 15 in Calgary may be heading to the Kootenay region, according to police

LETTER: Fletcher ‘blurs reality’ on B.C. union public construction

Bridge, highway projects awarded to companies, not unions

Most Read