The Trout Creek bridge in Summerland was constructed in 1913. A false-work tower was constructed in order to allow for the work to proceed. The bridge allowed the community to have train service. (Photo courtesy of the Summerland Museum)

Summerland railway bridge was constructed in 1913

False-work tower had to be constructed twice

In the spring of 1913, the Kettle Valley Railway built the bridge over Trout Creek Canyon.

To install the metal bridge work, construction of a false-work tower was required. The original height of the tower was 49 metres or 160 feet.

That year, the spring freshet completely destroyed the structure. The false-work tower was rebuilt in June.

The bridge was completed by the first week in October.

READ ALSO: Camps once housed workers along Kettle Valley Railway

READ ALSO: Summerland steam railway to mark 25th anniversary

The 1913 estimated cost of construction was $250,000.

Initially, the railway was designed to bypass Summerland, but in 1910, James Ritchie, reeve of Summerland, requested the railway not to bypass the community.

This request was turned down.

Ritchie then surveyed the area, using a carpenter’s level, and designed a route that would pass near the present research station.

The first train crossed the bridge on Oct. 25, 1913.

The first train to pass through Summerland was on May 31, 1915.

More than 2,000 people stood at the site of the train station to see the train. Schools were dismissed early and many businesses were closed for the day to allow people to watch the train.

This train consisted of a steam engine and its baggage car, a first class coach and a sleeper. It arrived in Summerland at 3:59 p.m.

In 1915, a trip from Summerland to Vancouver took 23 hours, 20 minutes.

The last passenger train to pass through Summerland came through the community Jan. 16, 1964.

In 1976, the railway station building was used to house the Summerland Museum. The station building was dismantled in 1985.

To report a typo, email:
news@summerlandreview.com
.



news@summerlandreview.com

Like us on Facebook and follow us on Twitter.

historyrailways

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

From 1915 until 1964, Summerland was served by passenger trains. Today, the Kettle Valley Railway Society operates a tourist train service along a portion of the track. (Photo courtesy of the Summerland Museum)

The Trout Creek Trestle connected Summerland with the rest of the Kettle Valley Railway line. The bridge was constructed in 1913. (Photo courtesy of the Summerland Museum)

Comments are closed

Just Posted

Horrifying video shows near head-on collision by Golden

The video was captured on dash cam along Highway 1

Morning Start: Dogs can smell cancer

Your morning start for Tuesday, July 7, 2020

Save-On-Foods donates to Golden Food Bank

The funds were a part of the Pay It Forward campaign.

Collision results in train derailment just east of Golden

The derailment occured Sunday night, according to a statement from CP.

QUIZ: A celebration of dogs

These are the dog days of summer. How much do you know about dogs?

84-year-old Okanagan resident finishes 12,000-piece puzzle

Willie Tribiger started the puzzle in 2013, completing it in six and a half years

Aces aplenty at Okanagan golf course

Vernon Golf and Country Club has 14 recorded holes-in-one since April 30

Fraser Valley woman complains of violent RCMP takedown during wellness check

Mounties respond that she was not co-operating during Mental Health Act apprehension

B.C. sees 12 new COVID-19 cases, no new deaths

Three outbreaks exist in health-care settings

Lost dog swims Columbia River multiple times searching for home

The dog was missing from his Castlegar home for three days.

Booze on beach extended through summer in Penticton

Pilot project will stay in place until Oct. 15

Sad ending in case of missing Okanagan senior

Body of Vernon man Wayne Orser found floating in Okanagan Lake Tuesday, July 7

COVID-19: B.C. promotes video-activated services card

Mobile app allows easier video identity verification

ICBC to resume road tests in July with priority for rebookings, health-care workers

Tests have been on hold for four months due to COVID-19

Most Read