Aerial photo shows upstream dike and sumps to contain tailings at Mount Polley mine

Mount Polley dike completed, investigators move in

New dike makes breach safe, allows downstream work on sumps to prevent further tailings to escape as mine investigation continues

An upstream dike has been completed at Mount Polley Mine, allowing investigators to probe the site of the original Aug. 4 dam breach.

The new structure is to make the breach area safe for inspection and work below, not to repair the original breach or retain water in the tailings pond, said Steve Robertson, Imperial Metals vice-president for corporate affairs.

“We’ve finished construction of the upstream dike, and now we’re establishing the sumps on the upstream side of that, and that will intercept the water that’s going to continue to flow out of the tailings,” Robertson said in an interview Friday. “If anything should get past that, we’ll have another sump outside of the breach that will capture any water that comes out through the breach and make sure that it gets put into the reclaim system.”

The sumps act as settling ponds, with the water pumped back up to another pit on the site of the copper-gold mine near Williams Lake.

Robertson said the continued work addresses the Ministry of Environment‘s non-compliance notice issued to the company Sept. 9, regarding discharge of water into the Hazeltine Creek channel.

Most of the available mine employees are back at work, with about 30 working on cleanup around Quesnel Lake. Work is expected to continue until there is too much snow cover to continue.

The environment ministry released more water test results Thursday, showing water collected at various sites and depths in the area remains safe to drink.

The immediate area of the tailings spill remains a “do not use” zone, and Interior Health advises local residents to avoid drinking cloudy water.

 

Just Posted

Widow of avalanche victim sues Golden Alpine Holiday

Widow of avalanche victim sues several guides, their mountain guide association and the lodge operator for negligence

CP Rail train derailed near Field, B.C.

There was no threat to public safety and no injuries: CP Rail

BC BUDGET: New spaces a step to universal child care

Fees reduced for licensed daycare operators

BC BUDGET: NDP cracks down on speculators, hidden ownership

Foreign buyers’ tax extended to Fraser Valley, Okanagan, Vancouver Island

BC BUDGET: Payroll tax replaces medical premiums

Health spending to increase $1.5 billion for drugs, primary care teams

VIDEO: Top 10 B.C. budget highlights

The NDP is focusing on childcare, affordable housing and speeding up the elimination of MSP premiums

How to keep local news visible in your Facebook feed

Facebook has changed the news feed to emphasize personal connections. You might see less news.

Canucks blow three goal lead, lose to Avalanche in overtime

Vancouver struggled on the penalty kill, as Colorado scored all five goals on the powerplay

BC BUDGET: NDP hope to nix court delays with $15 million cash influx

Union says funding could stop sheriffs from leaving for higher paid jobs

Cattlemen urge B.C. to prevent erosion caused during 2017 wildfire season

Other concerns are fencing restoration and repair, and a lack of feed for cattle.

Patrick Brown’s Tory leadership bid fate looms

Brown’s bid to for Tory leadership to be decided on Wednesday

Alberta shrugs off B.C. legal challenge on wine ban

The potential fine Alberta faces for violating free trade rules according to economic development minister

Yelling vulgar slur at reporter not a crime says judge

Judge rules ‘vulgar’ slur against reporter was not a public disturbance

B.C. runner takes silver at Pan American cross-country championships

Tyler Dozzi’s medal pushes U20 Team Canada to gold finish

Most Read