The Trans Canada Highway at Salmon Arm is subject to the latest of a long series of widening projects extending to the Alberta border. (B.C. transportation ministry)

B.C. highway widening job reduced, costs still up $61 million

Union-only project scales back work to widen Trans-Canada

The B.C. NDP government’s union-restricted road construction program is sparking new questions about a steep increase in costs, even as a section of Trans-Canada Highway widening work has been significantly scaled back.

Widening the Trans Canada Highway east of Kamloops is one of three major projects the NDP government designated for what it describes as “community benefits agreements.” They restrict the workforce to 19 mostly U.S.-based construction trade unions under a 336-page agreement with a new Crown corporation created to administer it. The others are replacement of the Pattullo Bridge at Surrey, and the Broadway subway extension in Vancouver.

The latest contract to be let under the agreement is for a section of Highway 1 at Salmon Arm, announced in June at a budget of $185 million, including $31 million from Ottawa. The announcement by Transportation Minister Claire Trevena explained the reduced size, three-year delay and $61 million increase in costs was because the 2016 project was completed without sufficient engineering and local engagement work.

Kamloops-South Thompson MLA Todd Stone, the former B.C. Liberal transportation minister, said the work was done by 2017, including consulting the Neskonlith Band. Questioned on the project by Stone and Shuswap MLA Greg Kyllo, Trevena said there is still no agreement with Neskonlith to proceed with a large portion of the widening.

Stone said the 9.9 km project has been reduced to 4.9 km, “with a two-lane section stuck in the middle between Hoffman’s Bluff and Chase West,” and elimination of an underpass.

“These massive cost overruns and project scope reductions are the direct result of the NDP delaying these projects for upwards of three years, on top of additional costs in the millions of dollars resulting from the NDP’s imposition of community benefit agreements requiring projects to utilize labour of one of 19 NDP approved unions,” Stone told Black Press July 6.

Trevena said agreement with Neskonlith is needed for the federal share of the money to be provided, and other costs were affected by a “hot market” for construction, up until the COVID-19 pandemic had broad effects on the economy.

“I think what we have now is the realistic budget,” Trevena said.

A tight construction labour market and high prices for steel and asphalt were also cited in the 35-per cent jump in cost for the first contract awarded under the union agreement, east of Revelstoke.

Trevena noted the first Salmon Arm contract went to a Kamloops-based company, and said the new union structure ensures more local, female and Indigenous people being hired as apprentices. That claim has been a source of bitter dispute with newer unions and non-union construction companies, who say they employ 85 per cent of people currently working in construction trades.

Premier John Horgan and the B.C. and Yukon Building Trades say it’s the completion of apprenticeships that is most important, and traditional building trades have an edge there.

RELATED: Contractors picked for Pattullo Bridge replacement

RELATED: Cost jumps 35% for Revelstoke widening section

The new Crown corporation, B.C. Infrastructure Benefits, controls payroll, union dues and benefits for designated public projects. It diverts an additional 25 cents per hour worked to a new union organization called the Allied Infrastructure and Related Construction Council of B.C., and another seven cents per hour to building trades union funds for health and safety.

Non-union or independent union-affiliated companies can still bid on projects, but their employees are required to join one of the designated international unions within 30 days of starting work.

When the $1.38 billion contract to build a new Pattullo Bridge was awarded in January, Trevena acknowledged that the union-only deal would add about seven per cent to the cost. The 83-year-old four-lane bridge is being replaced with another four-lane bridge with added pedestrian and bicycle lanes, and a new off-ramp to Highway 17, the South Fraser Perimeter Road.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Roots and Blues online festival live tonight on Black Press Media

Tune in to Black Press Media to watch the festival live Aug. 14, 15 and 16

Local artist stages ‘Explorations into Impressions’ exhibit

The art exhibit will showcase impressionist paintings of well-known locations close to Golden

Okanagan Correctional Centre outbreak due to training session: Interior Health

Interior Health said in a statement the staff members were at an off-site training session

Morning Start: A Texas law allows astronauts to vote from space

Your morning start for Friday, August 14, 2020

Invasive mussel monitoring stations detect 10 boats

Boats were headed to Okanagan and Thompson regions

‘Don’t kill my mom’: Ryan Reynolds calls on young British Columbians to be COVID-smart

‘Deadpool’ celebrity responds to premier’s call for social influence support

Captain Horvat’s OT marker lifts Canucks to 4-3 win over Blues

Vancouver takes 2-0 lead in best-of-7 NHL playoff series with St. Louis

Vernon pedestrian struck dies from injuries

Emergency responders are on scene on Main Street near the CIBC, traffic affected

UPDATE: Fire in Lake Country a “smoke chase”

A water bomber reportedly took off from Penticton and is on the way to Lake Country

Kelowna man convicted of not paying taxes after turbulent trial

Man claims he doesn’t meet the definition of a ‘person’ under the federal Income Tax Act

Accused in Kelowna’s 2018 Canada Day killing granted bail more than 1.5 years later

Esa Carriere was stabbed to death during the Canada Day fireworks in downtown Kelowna in 2018

Widow of slain Red Deer doctor thanks community for support ahead of vigil

Fellow doctors, members of the public will gather for a physically-distanced vigil in central Alberta

Protesters showcase massive old yellow cedar as Port Renfrew area forest blockade continues

9.5-foot-wide yellow cedar measured by Ancient Forest Alliance campaigners in Fairy Creek watershed

Most Read